MILESTONES AND ACHIEVEMENTS

  • YEARSACHIEVEMENT
  • 2016

    Modified POY line to enhance production of company by 8750 Ton per annum.

  • 2016

    Install 2 Nos. F.O. Base Gen Set to reduce power cost by approx Rs. 18.00 Crore per annum.

  • 2015

    Modified FDY line for manufacturing of Bright FDY and Color FDY yarns.

  • 2015

    Commissioned 25 nos. of TFO machines for plying & twisting for manufacturing Carpet Yarns.

  • 2014

    Commissioned 4 (Four) Texturising Machines with total capacity of 7200 TPA.

  • 2013

    Commissioned Waste Recycling Plant with 5400 TPA.

  • 2013

    Enhanced Spinning Capacity of Plant from 40600 TPA to 51450 TPA.

  • 2012

    Enhanced Spinning Capacity of the Plant from 53000 TPA to 100000 TPA with total project cost of Rs. 150.00 Crores.

  • 2012

    Commissioned 8.6 MW Gas based Genset Captive Power Plant, thereby total capacity of the captive power generation increased to 17.10 MW.

  • 2010

    Commissioned successfully Expansion cum Backward Integration Project with total investment of Rs. 150.00 Crores and increased company’s capacity from 12000 tons to 100000 tons (More than 8 times).

  • 2009

    Commissioned 6 MW Gas based Genset Captive Power Plant, enhancing the capacity of captive power generation by 8.5 MW.

  • 2009

    Commissioned fully imported C.P. PLANT (Continuous Polymerization Plant ) of 288 tones per day capacity or 100000 tones per annum as Expansion cum Backward Integration Project.

  • 2007

    Converted its coal based power plant of 2.5 MW to Gas based Gen Set Power Plant for further reducing its power cost. The Company has tie-up with Gujarat Gas Company for supplying the Gas through Pipeline for the said Power Plant.

  • 2006

    Installed 60 Water Jet Looms to manufacture 3.5 Million meters Woven Fabric per annum.

  • 2005

    Installed Polyester Spinning Plant to manufacture 12000 MT Polyester Filament Yarn (POY) per annum with capital investment of Rs. 300 Million.

  • 2004

    Increased the capacity of Texturising & Twisting to 3900 MT & 2000 MT respectively per annum.

  • 1999

    Installed coal based power plant of 2.5 MW for captive power generation with capital investment of Rs. 60 Million.

  • 1997

    Increased the capacity of Polypropylene Multifilament Yarn to 3900 MT per annum with capital investment of Rs. 144 Million.

  • 1996

    Changed of Name of the Company (Sumeet Synthetics Limited to Sumeet Industries Limited).

  • 1995

    Installed capacities of Texturising & Twisting of 1500 MT per annum for value addition with total project cost of Rs. 45 Million.

  • 1993

    Installed capacity of 1500 tons per annum of Polypropylene Multifilament yarn with total project cost of Rs. 200 Million.

  • 1992

    Conversion from Private Limited to Public Limited.

  • 1988

    Incorporation of Sumeet Synthetics Private Limited.